The tile is rarely the problem. The felt underneath it is. Tile work throughout Woodland Hills, lifted and relaid where the tile is still sound.
Free inspection, the deck and layer count established, then a written quote.
On a long, low Contemporary Ranch the tile runs are unusually long and the hips and ridges with them. Re-bedding and pointing those runs is most of the labor on a Woodland Hills tile job, and it is the part a cheap quote leaves out.
Concrete and clay tile will outlast the underlayment beneath it by decades. On a Valley roof laid in the 1970s or 80s, the tile can be sound while the felt it sits on has gone brittle and stopped doing anything at all.
This is the one where most people are quoted the wrong job. A full tile replacement in Los Angeles runs $15 to $25 per square foot - $30,000 to $60,000. A lift and relay, where your existing tile comes off, new underlayment goes down and the same tile goes back, is $8,000 to $22,000. Woodland Hills roofs are large for a single story, so the square footage lands at the upper end of every range on this page. South of the Boulevard the parcel may sit in a Very High fire zone, which adds about 22% for the fire-rated assembly.
Because the tile is not being bought again. On most West Valley roofs the tile has decades left and only the felt underneath it has failed.
$1 to $3 per square foot. The rest is the labor of lifting, stacking and relaying tile without breaking it.
Widespread cracking, or a profile so brittle that handling breaks more than it saves. We will tell you which one you have before quoting either.
A rambling single-story plan spreads a very large roof area over one floor, with long runs and shallow falls. Ponding and a poorly set fall are easy to miss on a roof that size, and wide eaves put the fascia a long way from the wall.
Woodland West is recognized by the LA Conservancy as an intact post-war neighborhood.
All roofing work in Woodland HillsMost homes lost to wildfire are ignited by embers rather than the fire front, and the roof is the largest surface an ember can land on.
A Class A roof assembly carries the highest fire rating a roof can have, and in the highest-risk fire zones it is what California's wildfire building standards call for. On the hill side of the Valley it is the rating worth asking for either way.
The fire rating of the whole assembly, not just the shingle or tile; the vent screening; and the ridge and eave closures. A quote that says only 'new roof' cannot be checked against any of that.
A rambling Contemporary Ranch spreads a very large roof over one story, and the wide eaves that define the style put the gutter line a long way from the wall.
Woodland West was completed in 1964 and the LA Conservancy recognizes it as an intact post-war neighborhood.
Large single-story plans mean long low-slope runs with very little fall to work with.
Original 1950s and 60s roofs in Woodland West have almost all been recovered at least once.
Large single-story plans mean large low-slope areas, and surface temperature on a dark membrane runs far above air temperature.
Bungalows and low-pitch ranch, plus butterfly roofs.
Newer tracts, and most of the tile in this market.
Post-war west Valley. Surveyed before anything is quoted.
Big lots, outbuildings, and a Very High fire zone.
The wider Valley, ranch tracts and flat additions.
City-wide, under LADBS permits and the state energy code.
The questions that decide a job, answered before you ask.
It might be the right price for the wrong job. Full tile replacement in Los Angeles is $15 to $25 per square foot, so $30,000 to $60,000 is a normal quote for one. But most West Valley tile roofs need a lift and relay instead - $8,000 to $22,000, because your existing tile goes back down.
Usually. Concrete profiles from the 1970s on are widely salvaged, and on a relay the tiles that come off are the match. Where a profile is genuinely discontinued we take sound tile from a low-visibility slope and put the near-match there.
For a full replacement in LA County, an estimated $10,000 to $25,000 covers most houses, and repairs usually run an estimated $350 to $1,500. The honest answer is that the range is wide because pitch, access, covering and what the old roof was hiding all move it - which is why the inspection is free and the quote is written down before any work starts.
A typical single-story Valley house is two to four days: tear-off and dry-in on day one, covering after. Tile takes longer than composition. Weather moves it, and we will not dry-in a roof we cannot finish.
Roofing in California requires a CSLB C-39 license, and the number is public - ask for it and check it on the CSLB register before anyone sets foot on your roof. Do that with every quote you get, not just this one.
Free inspection, written quote, and we will tell you if the cheaper option is the right one.