The tile is rarely the problem. The felt underneath it is. Tile work throughout Winnetka, lifted and relaid where the tile is still sound.
Free inspection, the deck and layer count established, then a written quote.
If the roof is tile, the question is not the tile's condition but the date of the felt under it. We establish that by lifting a section before quoting, because guessing it is how a repair turns into an argument halfway through.
Concrete and clay tile will outlast the underlayment beneath it by decades. On a Valley roof laid in the 1970s or 80s, the tile can be sound while the felt it sits on has gone brittle and stopped doing anything at all.
This is the one where most people are quoted the wrong job. A full tile replacement in Los Angeles runs $15 to $25 per square foot - $30,000 to $60,000. A lift and relay, where your existing tile comes off, new underlayment goes down and the same tile goes back, is $8,000 to $22,000. We price Winnetka off the survey rather than off an assumption. The covering and the layer count are what decide which of the ranges above you are actually in, and both are established before any number is written down.
Because the tile is not being bought again. On most West Valley roofs the tile has decades left and only the felt underneath it has failed.
$1 to $3 per square foot. The rest is the labor of lifting, stacking and relaying tile without breaking it.
Widespread cracking, or a profile so brittle that handling breaks more than it saves. We will tell you which one you have before quoting either.
We survey before quoting here rather than assuming a type. On any of these houses the question is the same: what the covering is, how old the underlayment is, and where the water is supposed to leave.
All roofing work in WinnetkaIncluding ours. Roofing in Los Angeles has enough storm-chasers that the checks are worth making on anyone.
Roofing in California needs a C-39 classification, and the CSLB register will confirm one in a minute. Ask for it at the first conversation rather than at the invoice.
A Chapter 7A fire-rated assembly costs 20-odd percent more than one that is not rated. A cheaper quote is sometimes a different, lesser roof rather than a better price.
We survey here rather than assume.
Before a replacement is quoted here the layer count has to be established, because California code caps overlays in practice at two.
Ponding depth gets measured at the low points before anything is quoted and again after the work.
Wind-creased shingles look perfectly intact from the ground.
A coating is not a cure for a failed substrate.
Bungalows and low-pitch ranch, plus butterfly roofs.
Newer tracts, and most of the tile in this market.
Rambling single-story ranch, long runs, wide eaves.
Big lots, outbuildings, and a Very High fire zone.
The wider Valley, ranch tracts and flat additions.
City-wide, under LADBS permits and the state energy code.
The questions that decide a job, answered before you ask.
It might be the right price for the wrong job. Full tile replacement in Los Angeles is $15 to $25 per square foot, so $30,000 to $60,000 is a normal quote for one. But most West Valley tile roofs need a lift and relay instead - $8,000 to $22,000, because your existing tile goes back down.
Usually. Concrete profiles from the 1970s on are widely salvaged, and on a relay the tiles that come off are the match. Where a profile is genuinely discontinued we take sound tile from a low-visibility slope and put the near-match there.
No. The inspection is free, the written quote is free, and there is no obligation attached to either. What we will not do is give you a price at the door without going up.
For a full replacement in LA County, an estimated $10,000 to $25,000 covers most houses, and repairs usually run an estimated $350 to $1,500. The honest answer is that the range is wide because pitch, access, covering and what the old roof was hiding all move it - which is why the inspection is free and the quote is written down before any work starts.
A typical single-story Valley house is two to four days: tear-off and dry-in on day one, covering after. Tile takes longer than composition. Weather moves it, and we will not dry-in a roof we cannot finish.
Free inspection, written quote, and we will tell you if the cheaper option is the right one.